1. Skip to content
  2. Skip to main menu
  3. Skip to more DW sites

Brave Tern - Working on the edge (episode 2)

05:57

This browser does not support the video element.

September 23, 2014

In our second episode, the offshore installation vessel BraveTern gets legs. As soon as it arrives at its Destination, the Global Tech One wind farm, it's jacked up on 60 meter self-elevating legs to give it stability in the North Sea. The jib crane can then lift the heavy components and installation of the wind farm's final two turbines can begin.

Skip next section DW's Top Story

DW's Top Story

Skip next section More stories from DW